Completed
Project Overview & Scope of Work
Scope Summary:
Industrial Master Planning, Multi-Storey Reinforced Concrete Superstructure, Structural Steel Trusses, and Infrastructure Execution
Comprehensive industrial engineering and structural contracting for US Apparel's advanced textile manufacturing complex at Sundar Industrial Estate. The facility incorporates multi-storey reinforced concrete framing designed for high live machinery loads, large-span structural steel roofing, industrial effluent management channels, and dedicated logistics loading bays.
Built to international occupational safety standards with optimized floor vibration damping for heavy spinning and weaving equipment.
Built to international occupational safety standards with optimized floor vibration damping for heavy spinning and weaving equipment.
Related Engineering Projects
Bilal Switchgear Engineering Industrial Facility
Sundar Industrial Estate (S.I.E), Lahore Case Study →
Shalimar Paint Corporate Office & Technical Facility
Plot No. 42-D, Sundar Industrial Estate, Lahore Case Study →
Industrial Aluminum Extrusion Factory
Plot No. 209, Sundar Industrial Estate, Lahore Case Study →Project Specifications
| Category: | Industrial Facilities & Factories |
| Service: | Civil Engineering & Infrastructure |
| Client: | US Apparel & Textiles |
| Location: | Sundar Industrial Estate (S.I.E), Lahore |
| Status: | Completed |
| Date: | Nov 2020 |
Tender Estimation
Planning a Similar Build?
Speak directly with our estimating department to discuss procurement, structural feasibility, and delivery timeline.
Request a Quote