Completed
Project Overview & Scope of Work
Scope Summary:
Long-Span Pre-Stressed Concrete Girder Bridge, High-Capacity Riverbed Piers, Seismic Dynamic Analysis, and Approach Highway
Strategic major civil infrastructure bridge spanning the fast-flowing Jhelum River at Dhangali. ALTEC Engineers performed comprehensive structural bridge engineering, dynamic seismic load dissipation analysis, hydraulic scouring protection for river piers, high-strength pre-stressed girder detailing, and approach highway civil earthworks.
This landmark transport link connects vital trade routes, designed to withstand maximum 100-year flood levels with zero settlement.
This landmark transport link connects vital trade routes, designed to withstand maximum 100-year flood levels with zero settlement.
Project Specifications
| Category: | Civil Infrastructure & Bridges |
| Service: | Civil Engineering & Infrastructure |
| Client: | National Highway & Infrastructure Authorities |
| Location: | Jhelum River, Punjab / AJK Border |
| Status: | Completed |
| Date: | Jun 2019 |
Tender Estimation
Planning a Similar Build?
Speak directly with our estimating department to discuss procurement, structural feasibility, and delivery timeline.
Request a Quote